• headergrafik
    Connecting networks safely,
    expertly, and efficiently
    Network construction

Overhead power line construction with lattice, wood or solid panel towers represents a traditional variant of grid construction. Installation / assembly on site is professionally carried out by our installers, taking local conditions into account.

OUR SERVICES
Assembly / disassembly of overhead lines in middle, low voltage and street lighting network, line renewal, line maintenance, route maintenance, disposal, material logistics.

Framework contract for overhead line construction Netze BW

Customer: Netze BW GmbH
Construction period: September 2011–March 2022
Framework contract for the new construction and maintenance of the 1 kV and 30 kV overhead line network in the network areas North, Middle and South

Framework contract for overhead line construction Stadtwerke Heidenheim

Customer: Stadtwerke Heidenheim AG
Construction period: since March 2023
Framework contract for the new construction and maintenance of the 1 kV and 30 kV overhead line network in their entire network area.

Various projects Stadtwerke Nürtingen

Customer: Stadtwerke Nürtingen GmbH
Construction period: since 2021
Overhead line network, maintenance, installation, delivery of material, dismantling, disposal, inspection of wooden masts

Framework contract for overhead line construction Albwerk / Stauferwerk

Customer: Albwerk GmbH & Co. KG / Stauferwerk GmbH & Co. KG
Construction period: since August 2018
Framework contract for construction and maintenance of the 1 kV and 30kV overhead line network in the entire network area.

1 kV and 20 kV exchange of wooden masts/steel pipe masts Netze BW

Customer: EnBW / Netze BW GmbH
Construction period: end of 2016–spring 2018
Exchange of approx. 1,200 wooden and steel pipe masts in the entire network area south and centre.

Dagersheim 20-kV cable overhead-ground transition steel-tube pole

Customer: EnBW / Netze BW GmbH RZ Mittlerer Neckar
Construction period: Since September 2011
Framework contract for construction and maintenance of 1 kV to 30 kV overhead network in the areas Kirchheim-West, Kirchheim-Ost, Horb, Nagold and Freudenstadt.

Various Projects Stadtwerke Crailsheim

Customer: Stadtwerke Crailsheim GmbH
Construction period: since September 2014
Overhead power line maintenance, installation, material supply, disassembly, disposal

Oberschönegg 20-kV conductor and fitting replacement

Customer: LEW Lechwerke AG / LVN
Construction period: September 2013
Switching, local network switchover and connection of the unit. Replacement of conductor, fittings, wooden masts and bird protection.

Framework contract for overhead line construction EnBW / Netze BW

Customer: EnBW / Netze BW GmbH
Construction period: since September 2011
Framework contract for new construction and maintenance of the 1 kV and 30 kV overhead line network in the network areas Kirchheim, Metzingen, Filderstadt, Schönbuch, Böblingen

Framework contract for overhead line contruction Stadtwerke Neuffen

Customer: Stadtwerke Neuffen AG
Construction period: since April 2011
Framework contract for new construction and maintenance of the 1 kV and 30 kV overhead line network in the entire network area.