    Connecting networks safely,
    expertly, and efficiently
    Network construction

As an established service provider for the construction of substations, we offer reliable and flawless solutions from planning up to taking into operation.
Quality, longevity, expertise and adherence to schedules are the main characteristics we pay special attention to in the construction of substations and which our customers value very highly in dealing with us.
No matter if outdoor or indoor facilities: we offer the best possible solution for every project and put it into practice for you – across all trades!

OUR SERVICES
Coordination and planning of substations up to 110 kV, general contractor service provider for all construction projects, delivery and installation of all components, project coordination, acceptance, documentation, primary and secondary adjustments of remote control systems / medium voltage and low voltage switch facilities / distributions, SF6 filling / disposal, underground engineering and steel construction works, drainage systems.

Transformer station Mudau

Customer: Netze BW GmbH
Construction period: March 2021–February 2022
Construction of two new compensation units
Dismantling and demolition of the old structures
Delivery of two spare power switches for the medium voltage facility
Renovation of the secondary and primary cabling
Expansion of the existing secondary technology
Dismantling of the old cables

Transformer station Unterboihingen & Schorndorf – exchange of circuit breakers

Customer: Netze BW GmbH
Construction period: April–October 2021
Exchange of a total of 8 circuit breakers on carriages
Air-insulated interior control units
Primary integration into the existing facility - retrofit
Primary and secondary planning
Adaptations of the carriage and of the switch panel
Secondary integration into the transformer station, telecontrol, and the alarm system
SF6-filling of the new circuit breakers
Professional disposal of the old, oil-insulated circuit-breakers
General contractor responsibility

Substation Rotensohl – erection of a 21 kV compensation reactor

Customer: TransnetBW GmbH
Construction period: March 2019–June 2020
Primary and secondary connection of compensation reactor and RC element
Delivery and installation of control cabinet
Delivery and installation of converters
Conversion and adaptations of the existing box
Delivery and installation of cable routes and steel frames for the connection of the provided equipment
Production of an oil-resistant steel floor
Support and installation of equipment
General contractor responsibility

Substation Laichingen – erection of a 21 kV compensation reactor

Customer: TransnetBW GmbH
Construction period: March 2019–March 2020
Primary and secondary connection of compensation reactor and RC element
Delivery and installation of control cabinet
Conversion and adaptations of the existing box
Delivery and installation of cable routes and steel frames for the connection of the provided equipment
Production of an oil-resistant steel floor
Support and installation of equipment
General contractor responsibility

Substation Bad Wimpfen – exchange of transformer cabling 110 kV incl. adaptation of charge elimination frame

Customer: Syna GmbH
Construction period: June–September 2018
Respectively for the transformers T111 and T112
Adaptation of the steel framework
Underground engineering works
Dismantling of existing cables
Relocation of converter units
Laying of cables and connection of the new systems

Substation Leutkirch – expansion by one field and one transverse coupler

Customer: Netze BW GmbH
Construction period: October 2018–September 2019
Coordination and planning of the field and the transverse coupler
Delivery and installation of all required components
Complete project coordination
Adaptation of remote control, hazard alert and all other existing facilities
Installation and connection of equipment and switches
Underground engineering works
Steel construction works
Drainage system
Acceptance and final documentation