    Road and civil engineering

TransnetBW, SuedLink VH3 building site equipment + preparation measures Großgartach

Customer: Siemens Energy Global GmbH & Co. KG
Construction period: 7 months Year of Construction: 2023
The project SuedLink Vorhaben 3 is the direct current connection between the stations Brunsbüttel in the North of Germany and Großgartach in the South. In order to integrate direct current lines like SuedLink into the existing alternating current network, convertors are required at the beginning and end points. These convert alternating current to direct current and vice versa.
The measure includes the preparation of the building site equipment areas and the preparatory earthworks in connection with the new construction of the future convertor substation Großgartach on a total surface of 70,000 m²: approx. 31,000 m² formation, 52,000 m² removal of surface soil, 13,000 m² earthworks, construction site lighting, construction roads, building site equipment areas, work areas, supply and waste disposal lines of the building site equipment.

New construction of a truck and railway wagon loading station for brick and bypass dust at the cement plant Schelklingen

Underground engineering, road construction, rail construction and civil engineering

Customer: Heidelberg Materials AG, Heidelberg
Construction period: 9 months Year of Construction: 2022–2023
Heidelberg Materials AG planned the construction of a railway wagon and truck loading station for brick and bypass dust at the cement plant Schelklingen. The foundation for a brick conveyor bridge was built in connection with this project, a railway wagon and truck loading station for brick was newly constructed, the existing industrial track connection was expanded, and a switch point was relocated. In addition to that, new drainpipes, empty conduits, and access points for the new infrastructure were produced.
765 m new construction railway
600 m³ reinforced concrete
4,500 m² asphalt
3,300 m cable conduits
19,000 m³ excavated material
400 m drainpipes

New construction of Reparaturniederlassung (repair workshop) Süd, Werk Ehingen-Berg

Earthworks and drainage channels

Customer: Liebherr Werk Ehingen GmbH
Construction period: 6 months Year of construction: 2021
10,000 m³ removal of topsoil
92,000 m³ treated soil material
15,500 m³ recycling material
6,100 t soil binder
990 t base course binder
2,900 m³ channel trench excavation
1,200 m armoured concrete pipes
2,100 m plastic pipes and drainpipes

Infrastructure provision residential area Graben/Vorderer tiefer Graben in Talheim

Infrastructure provision for 44 building plots in Talheim

Customer: LBBW Immobilien Kommunalentwicklung GmbH und Gemeinde Talheim
Construction period: 11 months Year of construction: 2019–2020

Earthworks

1,750 m² levelling works
6,200 m³ excavation of trenches
14,800 t disposal of soil
5,000 m² installation of soil

Drainage

1,050 m laying of drainpipes DN 100-300 PP and Stb
1,020 m laying of drainpipes DN 100-150 PE-HD
280 m wash boring DA 180 PE 100
22 pcs. prefabricated manholes DN 1200 + 1500 concrete
7 pcs. prefabricated manholes DN 600 plastic
4 pcs. extraordinary constructions concrete

Water supply and gas supply

14 pcs. hydrant manholes water supply DN 1500 and rectangular concrete
620 m underground engineering for cast iron water pipes DN 100-200
44 pcs. underground engineering for house connections water
750 m underground engineering for gas pipes DA 110
44 pcs. underground engineering for house connections gas

Cabling works

2,000 m laying of cables and empty ductwork incl. cable chutes
30 pcs. production of lighting mast foundations
Laying of fibre optic cable network of Telekom
Cabling power supply and fibre optic cable network of NHF

Pavement works

920 m³ installation ballast base course, combined antifreeze and base course 0/45
2,100 m² installation ballast base course, combined antifreeze and base course 2/45
2,000 m installation kerb stones
500 m installation gullies
3,000 m² installation drain concrete
4,000 m² installation asphalt base course, asphalt pavement, asphalt base course pavement
4,460 m² installation concrete pavement thickness=0,10 m arrangement in rows and thickness=0,14 m elbow pattern pavement

Infrastructure provision building area „Hühnlesäcker“ – Mühlrain in Ilsfeld-Auenstein

Infrastructure provision for housing project and renovation of Schulstraße including house service connections.

Customer: Landsiedlung Baden-Württemberg GmbH, Ummendorf
Construction period: 14 months Year of construction: 2019–2020
5,585 m³ earthworks
10,865 m² ground improvement
2,690 m waste water and rain water channel DN 100 to DN 500
85 m sewer with storage capacity and overflow DN 1400 – DN 1600 made of glass fibre reinforced plastic
360 m³ rain water detention basin as prefabricated concrete part
100 pcs manholes DN 1200
7 pcs combined channel systems for separate drainage DN 1500 (one channel for rain water and waste water)
4,490 m installation of kerbstones
1,985 m² paved surfaces
4,695 m² asphalt road
1,900 m water mains DN 50 to DN 150
2,800 m local heat pipes DN 25 – DN 125
1,350 m power and telecommunication lines each

Infrastructure provision building area „Rosenberg II“, Kochersteinsfeld

40 new building plots above the Kocher-Jagst-Radweg (cycling path)

Customer: STEG Stadtentwicklung GmbH
Construction period: 7 months Year of construction: 2019
Infrastructure provision for 40 building plots
5,000 m³ earth moving works
1,500 running metres channels
3,000 m³ ballast
4,500 m² asphalt

Infrastructure provision building area „Kandel“, 1st construction phase, Bad Rappenau

Infrastructure provision for 71 new building plots

Customer: Stadt Bad Rappenau
Construction period: 16 months Year of construction: 2018–2019
10,100 m³ excavation works
5,400 m² removal of top soil
7,100 m² asphalt surface layers
2,900 m² paving works

New line Wendlingen-Ulm PA 2.3 Merklingen joint venture

New construction of a high speed line with two tracks on a distance of 7.63 km, new construction stopping station Merklingen

Customer: DB Project Stuttgart-Ulm GmbH
Construction period: 4 years, 11 months Year of construction: 2015–2019

In total the contract includes:

Detailed planning for line and buildings
New construction stopping station Merklingen
6 bridge structures
2 tunnel structures in open construction method
2 underground rain water retention basins
1 purification and seepage basin for rain water
Construction of 2,600 m support walls
Production of drainage pipes for the drainage of the entire line
Production of the recesses and dams incl. all crossings of lines
Installation of mast foundations for later electrification of the line
Survey and renovation measures in the karst area Schwäbische Alb

Earthworks and drainage

87,000 m³ top soil works
1,300,000 m³ earthworks removal (about 80 % of which soil class 6+7)
746,000 m³ earthworks backfill (with supply of part of the soil)
800,000 m² removal and disposal
11,700 m reinforced concrete pipes DN 250-1200 (drainage pipes)
11,400 m seepage water drain pipes DN 150-250
500 pcs. manholes
20,500 m empty cable conduits DN 100-150
Material to be loosened by blasting approx. 850,000 m³

Commercial area development on the A 7 and reconstruction of a roundabout along the B 10

New commercial area on the A 7

Customer: Golsner Bau GmbH
Construction period: 6 months Year of construction: 2015
10.000 m2 of asphalt
1.8 km of gas, sewer and water pipes
4,000 m3 of earth moving
300 m sewer

Laudenbach – Kisselfließ development

Development of 140 building sites with large rainwater sewer overflow

Customer: MVV Enamic Regioplan
Construction period: 12 months Year of construction: 2013–2014
Development of 140 building sites
Installation of storm / rainwater sewers, gas, water, telecommunications and lighting
13,000 m2 of earth-moving
5,000 m2 of pavement surface
950 m2 of asphalt surface
3.5 km of curbstone (turf / low / high curb)
8.5 km of ductwork for cables
124 m rectangular storage sewer